An outdoor HVAC condenser unit on a concrete pad in front of a two-story suburban house.

Heat Pump Installation in LaGrange, GA

Tell us about the job

Takes about a minute. No obligation.

New system or replacementHeat PumpTroup County, GA
Step 1 of 2

What ZIP code is the job in?

Storms come through Troup County often

Troup County recorded 154 severe weather events between 2015 and 2024. That includes 121 damaging wind events, 24 hail events, and 5 tornadoes. A heat pump installed here has to deal with the weather, not just the heat and cold.

Outages are a real possibility

Close to a third of Georgia households went at least 24 hours without power in 2024. A heat pump runs on electricity for both heat and cooling, and so does the water heater in most homes here. When the power goes out, so does the system, no matter how new or well installed it is.

5 months
November through March, your system heats
5 months
May through September, it cools
35°F
the average winter night it heats against
89°F
the average summer afternoon it cools against
Isometric line illustration of a cutaway house showing interior rooms, an air handler with ductwork in the attic space, and an outdoor condenser unit beside the exterior wall.
Your system heats November through March and cools May through September.

NOAA nClimDiv, 1991–2020 normals

Heat pumps here run most of the year, November through March for heat and May through September for cooling.

April and October are the only slow months, which makes them the right time to put in a new system before it has to work.

Power here is cheap, so the payback that matters most isn't on the electric bill

Power here costs 14.41 cents per kilowatt-hour
121 damaging wind events from 2015 to 2024
24 hail events from 2015 to 2024
Most homes here already run on electricity77.5% of homes in Troup County heat with electricity, so a heat pump fits what's already there.

Troup County falls under zone 3A in the 2021 energy code, a warm, humid climate zone with a long cooling season. Any split-system heat pump installed here has to meet the federal minimum for that zone: at least 14.3 Btu of heat moved per watt-hour of electricity over the summer, and at least 7.5 Btu per watt-hour over the winter. Central air systems installed on their own face a regional minimum too, 14.3 SEER2 under 45,000 Btu/h and 13.8 SEER2 at or above it, higher than what the rest of the country requires. These are floors, not targets, so a unit has to clear them to go in legally. A heat pump that meets the federal minimum also qualifies for a federal tax credit, worth checking into before the purchase is final.

Plan this install around the outages, not just the weather

Where the outdoor unit goes and how it's protected matters as much as the system itself. Ask about surge protection and what keeps heat and hot water going when the power drops, since both run on electricity here. Get that settled as part of the install, not after the first outage.

Find a contractor
A gray air-source heat pump mounted on a concrete pad next to a house with gray vinyl siding, surrounded by gravel and flanked by green shrubs and white hydrangea flowers.

A Heat Pump That Never Really Stops

A heat pump has no off season. It switches between heating and cooling as the thermostat calls for it, and the outdoor unit sits outside through all of it, through rain, through dust, through whatever the compressor has to push against. More run hours means more cycles on the compressor, more time for the outdoor coil to pick up dirt and grime, and more wear on the contactor that switches it on and off. A system that runs steady through the year needs its filter checked on a regular schedule and its outdoor coil kept clear of leaves and grass clippings, because airflow is what keeps the compressor from working harder than it has to. Skip that upkeep and the first sign is usually weaker heating or cooling, not a breakdown, long before anything actually quits.

The old equipment comes out in pieces

Taking out an old system means disconnecting the refrigerant lines, pulling the indoor coil, and removing the outdoor unit. If the old system used a different refrigerant than the new one, the line set usually has to go too, since the oils and residues left behind don't mix well with what replaces them. Old refrigerant gets recovered, not vented, because releasing it is against the law.

The ductwork decides more than people expect

A heat pump moves a different volume of air than a furnace or straight air conditioner did, so the existing ducts get checked before the new unit goes in. Ducts that were sized for the old system can choke airflow on the new one, which shows up later as weak heating or a coil that freezes up. Any duct work needed is part of the install, not an afterthought once the new unit is running.

With power priced about average here, a high-efficiency heat pump takes longer to earn back its higher cost than it would somewhere with expensive electricity. That doesn't make efficiency a bad idea. It means it shouldn't be the only thing weighed when picking a system. A contractor sizing the install correctly and setting up the outdoor unit to handle wind and debris will matter more to how this system holds up than a couple extra points of SEER2. Put the money where it protects the house through a storm, not just where it shaves a little off the summer bill.

Install day starts with the old equipment shut down and the refrigerant lines opened, so expect the system off for most of the day. The crew sets the outdoor unit on a pad or bracket, runs new line set if the old one can't be reused, and mounts the indoor coil to match it. Electrical work comes next, a dedicated circuit and disconnect sized to the new unit, not just whatever was there before. Once it's wired and the lines are connected, the system gets evacuated to pull out air and moisture before refrigerant goes in, since either one left behind will hurt the compressor over time. The last part is the slow part: checking airflow at the vents, setting refrigerant charge to the manufacturer's numbers, and running the system through a full heating and cooling cycle before anyone calls it done. A rushed charge or a skipped airflow check doesn't fail that day. It shows up months later as a system that runs longer than it should to do the same job.